The Don Cesar engagement in St. Pete Beach, Florida, required an urgent and strategic response following damage caused by Hurricane Helene. Upchurch provided project management, preconstruction, and special projects expertise to restore operations quickly and efficiently, minimizing downtime for this high-profile hospitality facility.

Our Approach

Upchurch leveraged its emergency response capabilities and technical expertise to execute the project efficiently, including:

  • Rapid Emergency Response: Mobilized quickly to assess damage and implement immediate stabilization measures.
  • Efficient Equipment Retrofit: Retrofitted damaged equipment on-site to restore functionality and minimize operational disruptions.
  • Temporary Building Stabilization: Provided structural reinforcement for all building utilities and life safety systems to prevent further property damage.
  • Interim HVAC Solutions: Installed temporary HVAC systems to limit microbial growth and maintain air quality while permanent equipment was replaced.
  • Comprehensive Inspection & Diagnosis: Conducted thorough evaluations of all building equipment to ensure long-term reliability and functionality.

Outcome

Upchurch rapidly restored operational capacity at the Don Cesar, ensuring minimal business disruption. The project resulted in:

  • A swift and effective emergency response that mitigated further damage.
  • Fully stabilized building utilities and life safety systems.
  • A proactive HVAC solution to prevent environmental hazards.
  • A seamless transition from temporary to permanent infrastructure with minimal downtime.
  • A resilient, future-ready facility prepared to withstand potential challenges.