Sign outside of Coffeeville High School

Coffeeville School District

Project Overview

The Coffeeville School District in Coffeeville, Mississippi, required a comprehensive HVAC upgrade to ensure optimal climate control for both its elementary and high schools. Upchurch provided design-build assistance, assessing existing heating and cooling needs and implementing a strategic replacement plan. The project involved the removal of outdated systems and the installation of modern HVAC solutions to enhance indoor comfort and energy efficiency.

Our Approach

Upchurch’s expertise in K-12 facility management and HVAC services guided the successful execution of this project, including:

  • Initial System Assessment: Conducted a thorough evaluation of the schools’ heating and cooling needs, comparing existing systems with required performance benchmarks.
  • Phased HVAC Replacement: Demolished inoperable units and provided new package units and mini splits to meet the schools’ required load demands.
  • Seamless Project Execution: Ensured minimal disruption to school operations by maintaining a structured and efficient installation process.
  • Commitment to Safety and Efficiency: Completed the project ahead of schedule with zero safety incidents, reinforcing Upchurch’s dedication to high-quality service and safety standards.

Outcome

Upchurch successfully delivered a reliable and energy-efficient HVAC system for the Coffeeville School District, resulting in:

  • Improved climate control across both elementary and high school buildings.
  • Modernized HVAC infrastructure with optimized energy efficiency and performance.
  • A seamless transition from outdated systems to new, high-performing units.
  • A project completed ahead of schedule, ensuring uninterrupted school operations and enhanced learning environments.